• Lifting Machine for Rubber Feeding/Automatic Feeding Machine Bucket Lift
  • Lifting Machine for Rubber Feeding/Automatic Feeding Machine Bucket Lift
  • Lifting Machine for Rubber Feeding/Automatic Feeding Machine Bucket Lift

Lifting Machine for Rubber Feeding/Automatic Feeding Machine Bucket Lift

Certification: CE, ISO
Condition: New
Customized: Customized
Automatic Grade: Automatic
Structure: Vertical
Model Number: 12inch
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
TS-75
Voltage
380V
Weight
700kg
Color
as Your Requirements
Contact
Adopting PLC to Make Circuit
Motor
Double-Speed Motor
Capacity
300kg
Transport Package
Standard Wooden Case Packing
Specification
Customized
Trademark
BOJIA
Origin
Qingdao China
HS Code
8477800
Production Capacity
50 Piece/Months

Product Description

Product Description
                                             
 Lifting Machine for Rubber Feeding/Automatic Feeding Machine Bucket Lift


1.  Main technical parameters
mode 
terms 
TS75  TS110  TS50 
Lift speed (m/min)  9.5  9.5  9.5 
capacity(kg/batch)  90  130  160
Motor power (kw)  1.5  1.5  3
Dimension (mm)  3780 × 770 ×2260  3780 ×875×2260  3870 ×875×2350 
weitht (kg)  540  560  800 

 
2.  Application
This rubber elevator is a transportation machine. It is a auxiliary machine for rubber kneader. The main application is to deliver rubber material from rubber kneader to the rubber extruder or open rubber mixing machine. It is an essential part of mxing process, which can reduce labor intensity and improve the production efficiency.
 
   Features:
simple design and easy operate. It will work when power supply is provided.
The machine adopts welding structure and is annealed to remove stress.
Perfect self-lock and stop devic, which can ensure the safety of operator and protect the machine.
The heigh of the control cabinet is suitbal for the operature
 Entire pedestal is convenient for transportatio
The design is inflexible, and can satisfy the customer's requirements easily.

3.  packing or shipping 
(1).   For FCL goods, we usually pack machines with stretched film and then load them to the container. to ensure safety, we will fix machine with steel .
(2).  For LCL goods, we usually pack machines with standard wood boxes first, and then they will be transported .
 If you interested in our products mentioned above, kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!
Lifting Machine for Rubber Feeding/Automatic Feeding Machine Bucket Lift
Lifting Machine for Rubber Feeding/Automatic Feeding Machine Bucket Lift
Our Services
 
Our engineers can design target machines for customers and send them the drawing to confirm. We are always on the side of saving your cost.
In the process of production, we will take photos and send to customers for their track the progress.
Documents such as packing list, commercial invoice, and bill of lading etc. will be sent after the delivery.
We could supply free English foundation DWG, installation drawing, user guide, maintenance manual and part drawing.
We supply overseas engineer service and help to train your workers to operate the machine.
 
 
FAQ
 
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.
 
 
Packaging
 
Equipment painting completed before delivery, and then wrapped with stretch film, avoid rubbing the paint off the surface, wooden packaging can be customized, key parts, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
There are 15 experienced engineers and 108 skilled workers in our company, guaranteeing delivery on time as stipulated in the contract. At the same time, the company established a long-term cooperative relation with Cosco, for ensuring the goods arriving port on time.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now